Catholic Memorial High School | Waukesha WI

Image of Catholic Memorial High School - Exterior Windows

Phase I was completed in the summer of 2014 and included new air conditioning throughout the school, new front windows, lockers. Replacement of approximately 46 unit ventilators in the school along with upgrades to the lighting system. New lamps were installed with occupancy sensors contributing to energy savings. Instituted energy savings with a boiler replacement, lighting controls, as well as developing and implementing a facilities plan on an ongoing basis.